Shore Power Cable Reels
Shore power cable reels for cold ironing and onshore power supply (OPS): motorized reels built around the cable, voltage and length of your shore connection.
What is shore power?
Shore power - also called onshore power supply (OPS), shore-side electricity or cold ironing - lets a ship at berth switch off its auxiliary engines and take electricity from the port grid instead. The link between quay and ship is a heavy, flexible power cable. That cable has to be paid out to the vessel, kept under control while the ship moves with tide and loading, and stored safely when the connection is not in use.
That is the job of a shore power cable reel. Euroreels designs and manufactures motorized cable reels for this duty at its plant in Ankara, Türkiye.

Why demand is rising: EU rules from 2030
- AFIR - Regulation (EU) 2023/1804: by 1 January 2030, TEN-T maritime ports must have shore-side electricity able to serve at least 90% of the calls of container and passenger ships above 5,000 GT.
- FuelEU Maritime - Regulation (EU) 2023/1805: from 1 January 2030, container and passenger ships above 5,000 GT moored in a TEN-T port must connect to OPS and use it for their power demand at berth. From 1 January 2035 the obligation extends to any EU port where OPS is available. Only ships staying two hours or more at berth are covered.
Every new berth connection needs reliable cable handling on the quay, on a mobile unit or on board. That is where the cable reel sits in the system.
What a shore power cable reel must do
- Controlled pay-out and retrieval: an electric motor with brake and gear reducer, driven from a control panel with speed adjustment.
- Follow the vessel: the cable must not be overstretched or left slack on the quay as the ship rises, falls and shifts during mooring.
- Transfer power while turning: a slip ring sized to the load, in an enclosed housing for outdoor and marine use.
- Protect the cable: roller cable guides and, from 30 m upwards, an optional level-wind system for orderly winding.
- Survive the quay: powder-coated steel as standard, with SS304 or SS316 stainless steel options for salt-laden environments.
How Euroreels builds shore power reels
| Item | Euroreels design |
|---|---|
| Drive | Electric motor with brake and gear reducer; control panel with speed adjustment. Manual and spring drives for small connections. |
| Cable length | Up to 500 m as standard; longer lengths designed per project |
| Cable, voltage and current | Defined by the shore connection specification: cable type, cross-section, number of cores and voltage class |
| Current transfer | Slip ring selected for the load; enclosed version for outdoor use |
| Cable management | Roller cable guide; optional level wind from 30 m |
| Materials and finish | Steel construction, electrostatic powder coating (RAL 7033 standard for motorized drums); SS304 / SS316 options |
| Mounting | Quay or frame mounting, trailer or vehicle mounting for mobile units |
| Quality and warranty | Produced under ISO 9001, ISO 14001 and ISO 45001; 12-month warranty |
Euroreels supplies the cable reel. Frequency converters, transformers and ship connection systems are supplied by the shore power integrator; we design the reel around their specification.
Where they are used
- Container, cruise and ro-ro terminals, through shore power integrators
- Ferry berths and workboat quays
- Shipyards and outfitting quays, where vessels need power for weeks
- Mobile power: trailer-mounted generator sets feeding vessels or temporary berths
Our heavy-duty mobile generator cable reels share the same drive, frame and slip ring design, and the full range of industrial cable reels covers smaller connections.

Frequently asked questions
Is cold ironing the same as shore power?
Yes. Cold ironing, shore power, shore-side electricity and onshore power supply (OPS) all describe supplying a ship at berth with electricity from the shore so that its engines can be switched off.
Which ships must use shore power in the EU?
Under FuelEU Maritime, container and passenger ships above 5,000 GT must connect to shore power at TEN-T ports from 1 January 2030 when they stay at berth for two hours or more, and at any EU port with OPS available from 1 January 2035, unless an exemption or a zero-emission alternative applies.
Can you build a reel for our voltage and cable?
The reel is designed around your cable. Send us the cable type, cross-section, voltage class, current, working length and mounting position, and we will confirm the slip ring, drive and drum size for your project.
Do you supply the complete shore power system?
No. Euroreels manufactures the cable reel. The power conversion and ship connection equipment comes from the shore power integrator, and we work to their interface requirements.
Regulation summary based on Lloyd's Register guidance on FuelEU zero-emission requirements at berth and the Alternative Fuels Infrastructure Regulation. Check the current legal text for your project.
Related solutions
- Motor driven reels - Electric and hydraulic drives compared, with lengths and applications.
- Mobile generator cable reels - Heavy-duty motorized reels for trailer-mounted gensets.
- Manufacturer in Türkiye - Plant, capacity, lead times and how export orders run.